2050291: SHANNAGH, KILCAR, DONEGAL PO
FOR A PERIOD OF TEN YEARS FOR THE ADDITION OF TWO WIND TURBINES TO THE EXISTING THREE TURBINE WINDFARM. THE DEVELOPMENT WILL CONSIST OF THE FOLLOWING: CONSTRUCTION OF (1) TWO WIND TURBINES WITH HUB HEIGHTS OF UP TO 55 METRES AND AN OVERALL HEIGHT OF UP TO 77 METRES TO BLADE TIP; (2) TWO CRANE HARDSTAND AREAS LOCATED BESIDE EACH TURBINE; (3) ONE 20 KV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT (4) INTERNAL WINDFARM UNDERGROUND CABLING AND NEW SITE ACCESS TRACK AND INSTALLATION OF (1) A DRAINAGE SYSTEM FOR THE PROPOSED HARDSTANDS AND ROAD ACCESS (2) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910M IN LENGTH, PREDOMINANTELY ALONG THE EXISTING WINDFARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS
- Status
- Refused
- Lodged
- 10 Mar 2020
- Decided
- 25 Jun 2020
- Type
- Permission
- Council
- Donegal County Council
- Council record
- eplanning.ie/DonegalCC/AppFileRefDetails/2050291/0
- Town
- Donegal Po
- Street
- Sold prices on Shannagh
View location on OpenStreetMap
Other applications on Shannagh
- 2350638SHANNAGH, LAGHEY, DONEGAL PO · Conditional · 10 May 2023
Recent applications in Donegal Po
- 2661680BALLINAMORE, FINTOWN, DONEGAL PO · 10 Sept 2026
- 2661677MULLANACROSS, LAGHEY, DONEGAL PO · 9 Sept 2026
- 2661667FINCASHEL, PETTIGO, DONEGAL PO · 8 Sept 2026
- 2661649CROCKAHANY, ROSSNOWLAGH UPPER, DONEGAL PO · 4 Sept 2026
- 2661639ROES, FROSSES, DONEGAL PO · 3 Sept 2026
- 2661642MULLANACROSS, LAGHEY, DONEGAL PO · 3 Sept 2026
Source: National Planning Application Database (NPAD), Department of Housing, Local Government and Heritage (CC BY 4.0); look the application up on the council's ePlanning register for documents and the current status. A lodged application is not an approval; an approval is not proof of completed works. Applicant names are not published.