2151263: SHANNAGH & COGUISH, KILCAR

40 YEAR PERMISSION FOR AN ADDITIONAL 1 NO. WIND TURBINE, TO THE EXISTING 3 NO. TURBINE WINDFARM CONSISTING OF CONSTRUCTION OF: (1) 1 NO. WIND TURBINE WITH A HUB HEIGHT OF UP TO 84 METRES AND AN OVERALL HEIGHT OF UP TO 125 METRES TO BLADE TIP, (2) 1 NO.CRANE HARDSTAND AREA LOCATED BESIDE THE TURBINE, (3) 1 NO. 20 kV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT, (4) INTERNAL WIND FARM UNDERGROUND CABLING, (5) NEW SITE ACCESS TRACK, (6) INSTALLATION OF A DRAINAGE SYSTEM FOR THE PROPOSED HARD STAND AND ACCESS TRACK AREAS, (7) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910 METRES IN LENGTH, PREDOMINANTLY ALONG THE EXISTING WIND FARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS IN THE TOWNLANDS

Status
Refused
Lodged
24 Jun 2021
Decided
12 Aug 2021
Type
Permission
Council
Donegal County Council
Council record
eplanning.ie/DonegalCC/AppFileRefDetails/2151263/0
Town
Kilcar
Street
Sold prices on Shannagh & Coguish

View location on OpenStreetMap

Recent applications in Kilcar

Source: National Planning Application Database (NPAD), Department of Housing, Local Government and Heritage (CC BY 4.0); look the application up on the council's ePlanning register for documents and the current status. A lodged application is not an approval; an approval is not proof of completed works. Applicant names are not published.