Donegal Property Facts

2562310: TULLYDONNELL UPPER & CONVOY TOWNPARKS, CONVOY, LIFFORD PO

A 10-YEAR PLANNING PERMISSION FOR CONSTRUCTION OF A PHOTOVOLTAIC SOLAR FARM DEVELOPMENT AND ALL ASSOCIATED SITE WORKS. THE DEVELOPMENT WILL CONSIST OF LINEAR ARRAYS OF SOLAR PHOTOVOLTAIC PANELS ON GROUND MOUNTED FRAMES OVER TWO ADJACENT PLOTS OF CA. 13.88 HECTARES OVERALL AREA, INCLUDING: ASSOCIATED CABLING & DUCTING; A 20KV ELECTRICAL CONTROL BUILDING; SITE ENTRANCES AND ACCESS TRACKS; TRANSFORMERS AND INVERTERS; PERIMETER FENCING UP TO 2.5 METRES HIGH; POLE MOUNTED CCTV CAMERAS UP TO 3 METRES HIGH; UNDERGROUNDED ELECTRICAL CABLE TO CONNECT THE TWO SEPARATE SOLAR FARM PLOTS; TEMPORARY CONTRACTOR’S COMPOUND AND TEMPORARY STORAGE AREA; AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED UNDERGROUND GRID CONNECTION CABLE OF CA. 607 METRES LENGTH WILL BE INSTALLED ALONG THE L-5754 AND L-1074 LOCAL ROADS FROM THE PROPOSED ON-SITE ELECTRICAL CONTROL BUILDING INTO THE EXISTING CONVOY ESB SUBSTATION. THE PROPOSED DEVELOPMENT WILL HAVE A 40-YEAR OPERATIONAL LIFESPAN FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

Status
Further Information
Lodged
19 Dec 2025
Type
Permission
Council
Donegal County Council
Council record
eplanning.ie/DonegalCC/AppFileRefDetails/2562310/0
Town
Lifford Po
Street
Sold prices on Tullydonnell Upper & Convoy Townparks

View location on OpenStreetMap

Recent applications in Lifford Po

Source: National Planning Application Database (NPAD), Department of Housing, Local Government and Heritage (CC BY 4.0); look the application up on the council's ePlanning register for documents and the current status. A lodged application is not an approval; an approval is not proof of completed works. Applicant names are not published.